Fiji Airports require the Civil and Structural Works to be carried out as indicated in the vicinity of the new T3 baggage belt and new Awning.
Recently, we have successfully completed the Installation of a New Containerized Fire Pump
Remove all concrete beams offsite. Excavate area to required depth size. Backfill and compact the area with boulders and base course.
Foundation works for new incinerator plant and general refurbishment of the incinerator building.
T2 & T6 Door, C bracket, Nozzles, Manholes Fabrication and Installation, Blasting, Painting Works Internal and External of Tank 2 and 6 Associated Piping Works
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.